150 Kg/h Hot Melt Glue Stick Equipment Production Line
Other recommendations for your business
Contact us
Quik Detail
plastic processed | PVC |
---|---|
application | Granules |
Screw Design | Single-screw |
Screw Material | 38CrMoAi |
screw diameter (mm) | 90 mm |
screw l/d ratio | 1:100 |
place of origin | Shandong, China |
brand name | YD |
voltage | 220V/380V/415V |
dimension(l*w*h) | CAPACITY |
power (kw) | 22 |
warranty | 1 Year |
key selling points | Automatic |
video outgoing-inspection | Provided |
core components | Bearing, motor, Pump, Gear, PLC, Engine, Gearbox, Screw |
machinery test report | Provided |
Machine type | Glue stick making machine |
Application | Hot melt glue stick |
Function | Profile Producing |
Output | 100-150 kg/h |
Material of machine | SS and CS |
Mixing machine | Reactor |
Stick shape machine | Screw extruder |
Cooling basin | 20-30m |
Tractor | 2.2kw |
Cutter | 2.2kw |
Condition | New |
Showroom Location | UAE, Bangladesh, Uzbekistan |
After-sales Service Provided | Video technical support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Online support |
After Warranty Service | Video technical support, Online support, Spare parts |
Local Service Location | Chile, UAE, Bangladesh, South Africa, Uzbekistan |
Applicable Industries | Building Material Shops, Manufacturing Plant, Machinery Repair Shops, Printing Shops, Construction works |
Marketing Type | Hot Product 2019 |
Warranty of core components | 1 Year |
Output (kg/h) | 100 - 150 kg/h |
Weight | 8-20T |
Certification | ISO9001-2000 |
Product Detail
150 kg/h hot melt glue stick production line
→ Machine photos for your reference:
→ Packaging & Shipping
1. About Delivery time
Q-----What’s the delivery term for making business with us?
A-----Usually we send the shipment in FOB term.However, the terms of CIF are acceptable which depend on the preference of clients.
2. About Lead Time
Q------What’s the lead time after placing the order?
A------Usually it takes about 15~30 days after we received your confirmation.
However, it would depend on our production line schedule(the timing clients place order)and the complication of the item.
3. About Payment Term
Q------What’s the Payment Term?
A------By T/T in Advance, or Irrevocable L/C as Sight.
→Any interests, please contact me.