OEM One Hand Tear Paper Roll Holder Easy Tearing Stainless Steel Kitchen and Bathroom Tissue Paper Towel Pumping
US $4.65-4.85 / piece
1000 piece(s)Minimum order
Warranty:
1 Year
After-sale Service:
Online technical support
Project Solution Capability:
graphic design
Application:
Kitchen
Design Style:
Modern
Place of Origin:
GUA
Privacy Policy:
Samples are free within a certain price range
Other recommendations for your business
Contact us
Quik Detail
Warranty | 1 Year |
---|---|
After-sale Service | Online technical support |
Project Solution Capability | graphic design |
Application | Kitchen |
Design Style | Modern |
Place of Origin | GUA |
Brand Name | None |
Material | metal |
Product Detail
Product Description
Product Description









Packing & Delivery
Packing & Delivery



We promise to provide consumers with the highest quality and most professional logistics services. Excellent quality product packaging.
Company Profile
Company Profile


FAQ
FAQ1. What kind of products are you selling?
Sanitary ware including toilets, bidets and basins. Faucets, showers ect.
Toilet: back to wall / wall hung / one-piece / two-pieces.
Bidet: back to wall / wall hung.
Basin: above / under counter / wall hung/thin edge basin/art basin
Toilet: back to wall / wall hung / one-piece / two-pieces.
Bidet: back to wall / wall hung.
Basin: above / under counter / wall hung/thin edge basin/art basin
colors and white
2. Are you manufacturer or trading company?
We are a distributor with more than ten years of experience, mainly dealing in various decorative materials, such as: toilets, laundry cabinets, sinks, bathroom accessories, etc. At the same time, we also have our own factory, which mainly produces toilets, faucets, etc. We have the most and newest product resources and price advantages.
3. Can you put our own brand?
Yes, we can. ODM is welcomed.
4. How is your product quality?
Our products all produced in our factory, by three times QC checking, three steps during producing, after finish
production and before packing. Every sink were tested by strictly inspection to make sure no leakage. Giving our promise on every items in good quality finish and packing, we keep smoothly surface, good raw material and good klein firing. Your trust is our motivations on road.
5. What is the normal lead time?
Most of the items can be shipped within 25 to 30 days.