Premium Rebar Manufacturing for Long-Term Building Needs

US $0.10-0.14 / kilogram
10 kilogram(s)Minimum order
Standard:
AiSi
Grade:
HRB400
Length:
12M
Place of Origin:
China
Brand Name:
zhongtian
Model Number:
zt-rebar
Privacy Policy: Samples are free within a certain price range

Contact us

Send Inquiry

Quik Detail

Standard

AiSi

Grade

HRB400

Length

12M

Place of Origin

China

Brand Name

zhongtian

Model Number

zt-rebar

Tolerance

±1%

Alloy Or Not

Non-Alloy

Delivery Time

8-14 days

Product name

Mild Deformed Steel Rebar

Type

Carbon Steel Bar

Shape

Straight-bar

Technique

Clod Drawn Hot Rolled

Material

Reinforcement Ribbed Steel Bar

Commodity

Construction Deformed Steel Rebar

Main Application

Buliding Construction

Surface

Requirement

Color

Customers Samples Color

Product Detail

_01

Product Name Mild steel rebar for construction/Steel Bar /Steel Rebars
Material HRB335, HRB400, HRB500, JIS SD390,SD490,SD400; GR300,420,520;ASTM A615 GR60;BS4449 GR460,GR500
Grade HRB400/HRB500/KSD3504 SD400/KSD3504 SD500/ASTM A615,
GR40/ASTM GR60/BS4449 B500B/BS4449 B460 Et
Specifications Diameter:6mm,8mm,10mm,12mm,16mm,20mm,22mm,25mm,28mm,32mm,40mm,50mm Or OEMLength:6m-12m as your required
Surface Finished Screw-thread,Epoxy coating,Galvanized coating
Standard GB:HRB400 HRB400E HRB500
USA:ASTM A615 GR40,GR60
UK: BS4449 GR460
Inspection Methods Tensile testing
(1) Tensile test method: GB/T228.1-2010, JISZ2201, JI SZ2241, ASTMA370, 1497, BS18, etc;
(2) Bending test method: often use standard test methods have GB/T232-88, YB/T5126-2003, JISZ2248, ASTME290, ROCT14019, etc.
Application Rebar is widely used in building, bridge, road and other civil engineering construction. From highway, railway,bridge, culvert,
tunnel, flood control, dam and other public facilities, to the building foundation, beams,columns, walls, plates, screw steel are
indispensable structural materials. With the deepening of China's urbanization,the demand for rebar is strong for infrastructure
construction and the booming development of real estate.
Quality Approved by SGS,ISO
Package Water proof paper is inner packing,galvanized steel or coated steel sheet is outer packing , side guard plate,then wrapped by seven steel belt.or according to customer's requirement
Payment terms T/T, L/C at sight,West Union,D/P,D/A,Paypal
Delivery time 7-15 Days

_02

Rebar Hrb 355 Hrb400 Hrb500 8mm 10mm 12mm 14mm 16mm cement iron rod Reinforcing Deformed rebar Steel Bars rod

 

Rebar is the common name for hot rolled ribbed steel bars. The grade of ordinary hot-rolled steel bar is composed of HRB and the
minimum yield point of the grade. H, R, and B are the first letters of the three words Hotrolled, Ribbed, and Bars respectively.
Hot-rolled ribbed steel bars are divided into three grades: Grade II HRB335 (the old grade is 20MnSi), Grade III HRB400 (the old
grades are 20MnSiV, 20MnSiNb, 20Mnti), and Grade IV HRB500.

_03

_04

_05

Q:What kind of work does your company do?

A:Our company is a professional manufacturer.We mainly produces stainless steel plate/pipe/coil/round bars,as well as aluminum plate/pipe/coil/bar

Q:What are the advantages of your company?

A:

(1): Prime quality and reasonable price.

(2): Wide excellent experiences with after-sale service.

(3): Every process will be checked by responsible QC which insures every product's quality.

(4): Professional packing teams which keep every packing safely.

(5): Trial order can be done in one week.

(6): Samples can be provided as your requirements.

Q:What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance based on BL copy or LC at sight.If you have another question, please contact us as below

Q:What about your price?

A:Our price is very competitive because we are a factory.Pls feel free to contact us if you are interested in our products.

Q:How long is your delivery time?

A:Different products have different delivery time.The products will be delivered as soon as possible on the basis of the quality assurance.Usually the delivery time is within5 days after we received your deposit.

 

 

Send Inquiry

Send Inquiry
Close Inquiry Basket

Send Inquiry
Close

Send Inquiry
Close
Chat with us!Search productsInquiry BasketBack to top
Close Inquiry Basket

Send Inquiry

Send Inquiry