Bitumen Decanter DT8 Bitumen Melting Machine With 8-10ton/ Hour
Other recommendations for your business
Contact us
Quik Detail
Video outgoing-inspection | Provided |
---|---|
Machinery Test Report | Provided |
Core Components | PLC, motor |
Place of Origin | Henan, China |
Brand Name | SINOSUN |
Voltage | 220V/380V/440V |
Power | 28KW |
Dimension(L*W*H) | 7500*2250*2560 |
Weight | 10000 kg |
Warranty | 1 Year |
UNIQUE SELLING POINT | Fully hydraulic system |
Product name | Bitumen Decanter DT8 Bitumen Melting Machine with 8-10ton/ Hour |
Usage | melting bitumen |
Burner | Light oil burner |
Boiler | Hot oil boiler |
Fuel Consumption | 10-25 Kg/h |
Oil pool capacity | 15000L |
Finished asphalt temperature | 120~140℃ |
thermal oil heating furnace | 40*100000 kcal/h |
Dimension of thermal oil heating furnace | 7000*2200*2400mm |
After Warranty Service | Video technical support |
Product Detail
Bitumen Decanter DT8 Bitumen Melting Machine with 8-10ton/ Hour
The bitumen melting machine have the below:
Main Characteristics
1. Environmental friendly: closed structure and no pollution.
2. Energy saving: using the heat of waste gas(320~450℃) emission from thermal oil furnace to heat (final exhaust temperature about 150℃). Compared with the open asphalt dumping equipment, the totally closed type and save more 50% energy.
3. Asphalt is not hanging barrels:This equipment using 320 ~ 450℃ waste gas heat the barrel wall directly, so the asphalt dumping very clean to avoid the asphalt waste and pollution.
4. Automatic slag removal: the equipment's structure is advanced, with the internal self-discharging and external slag removal function, and has solved the technical problem in the world.
5. Adaptable: applicable to various kind of imported and domestic models, and the deformation of asphalt barrels will not affect production.
6. Good dehydration property: using large displacement asphalt pump for internal circulation, stirring, steam overflow, draught fan sucked into air and de-watering by negative pressure.
7. Safe and reliable: with automatic control system, imported automatic ignition burner, automatic control according to the oil temperature and corresponding monitoring instruments.
8. Easy to move: the whole machine adopts parts assembly, move easily and assembly quickly
Main Parameters of the Bitumen Melting Machine DT8
No. |
Item |
Standard value |
unit |
Remark |
1 |
Capacity |
8-10 |
t/h |
ambient temperature of barrel matrix asphalt not lower than 20℃ |
2 |
Finished asphalt temperature |
120~140 |
℃ |
|
3 |
Barrels in each pallet |
24/40 |
pieces |
All kinds of Barrels of domestic and international |
4 |
Heat capacity of thermal oil heating furnace |
40*104 |
kcal/h |
|
5 |
Temperature of thermal oil |
200~240 |
℃ |
|
6 |
Total power |
26 |
KW |
Diesel burner |
7 |
Oil pool capacity |
15000 |
L |
|
8 |
Total weight |
21000 |
kg |
|
9 |
Overall dimension(length×width×height) |
7500*2250*2560 |
mm |
|




About SINOSUN GROUP
SINOSUN is one of China’s dominant and professional manufacturers and exporters of Precisioned Asphalt Mixing Plants and related asphalt plant equipment.
We mainly supply:
1. Stationary Batch Mix Asphalt Plant (SAP series)
2. Recycle Asphalt Mixing Plant (SR series)
3. Mobile Batch Mix Asphalt Plant ( MAP series)
4. Continuous/Drum Mix Asphalt Plant (CAP series)
5. Bitumen Melting Machine / Bitumen Decanter(DT series)
6. Emulsion Bitumen Plant (RH series)
7. Burner For Asphalt Mixing Plant
Q:Which countries your equipment have been exported?
A:Thailand, Philippines, Indonesia, Myanmar, Russia, Bangladesh, Kazakhstan, Uzbekistan, Russia, Romania, Somalia, Kenya, Malawi, Nigeria, Togo, Mozambique, Oman, South Africa, America, Peru, Chile, Colombia, Venezuela, Australia, etc.
Q:How many workers are needed to operate one set of asphalt plant?
A:1 loader operator, 1 mechanical, 1 electrician, 1 supervisor ,1 the operator of the whole plant.
Q:How many days are used for installation of one set asphalt plant?
A:Around 20-30 days, according to local situation.
Q:Do you provide overseas erection and training service?
A:Yes, we can send experienced engineers to your country, guide erection and commissioning and train your workers how to operate the plant.
Q:How long is the delivery time?
A:30-40 days, according to different configuration. We promise to delivery on time.
Q:Can you sent me some spare parts freely?
A:Some spare parts will be sent to you together with asphalt plants freely.
Q:How to go to your asphalt plant factory easily?
A:Our city has airport. If by air, you can fly from Guangzhou/Beijing/Shanghai no more than 2 hours. Also you can fly to Zhengzhou, we send car to pick you up there.
Q:Can I visit your factory?
A:Of course. We warmly welcome you to visit our factory. And we provide you great services like airport pick up, hotel booking, etc.
Q:How long is the warranty of your asphalt plant?
A:12 months
Q:What payment terms you accept?
A:We accept T/T, L/C,D/A,D/P, Western Union, MoneyGram and other ways according to the practical situation.
Get the quotation of asphalt mixing plant, welcome contact us at any time.
Pls following us for more information of asphalt plant and related equipment.