Factory Cost Price Full Set Automatic Small Scale Mineral Pure Water Bottling Plant

1 set(s)Minimum order
application:
Beverage, Machinery & Hardware, Water
packaging type:
Bottles
packaging material:
Plastic, PET
automatic grade:
Automatic
driven type:
Electric
Voltage:
380V
Privacy Policy: Samples are free within a certain price range

Contact us

Send Inquiry

Quik Detail

application

Beverage, Machinery & Hardware, Water

packaging type

Bottles

packaging material

Plastic, PET

automatic grade

Automatic

driven type

Electric

Voltage

380V

place of origin

Guangdong, China

brand name

FOSTREAM

dimension(l*w*h)

3500*2000*2200 mm

warranty

1 Year

key selling points

Easy to Operate, High-accuracy, Long Service Life, Automatic, High Productivity

filling material

Water

filling accuracy

99.8%

machinery test report

Provided

video outgoing-inspection

Provided

core components

motor, Pump, PLC, Bearing

filling nozzle

16

After-sales Service Provided

Video technical support, Online support, Free spare parts

Function

Bottled Water Production

Machine Capacity

1000 to 18000 bottles/hour (Customized)

Bottle Size

200-2500ml (Customized)

Bottle Shape

Round or Square

Machine Material

Stainless Steel SUS304

Control System

PLC

Display System

Color Touching Screen

Workshop Layout

Free Design

Advantage

Stable Operation

Installation

Timely Overseas Engineer Service

Weight

3000 KG

Product Detail

VR
Products Description
How to set up a bottled water plant?
1. Market Research:
Analyze the demand for bottled water in your target area, study the competition, and identify your potential customers.
2. Legal Requirements:
Obtain the necessary licenses and permits, including business licenses, health and safety certifications, and environmental clearances.
3. Location and Facility:
Choose a suitable location with access to a clean water source. Design and construct a facility that meets hygiene and production standards.
4. Water Treatment System:
Install advanced water treatment equipment to purify the water, removing impurities, contaminants, and microorganisms.
5. Bottling and Packaging:
Purchase bottling machines and packaging materials to ensure the quality and appearance of the bottled water.
6. Quality Control:
Establish a strict quality control system to monitor the water quality at every stage of production.
7. Staffing:
Hire trained and experienced workers for operations, quality control, and management.
8. Distribution and Marketing:
Develop a distribution network and marketing strategy to promote and sell your bottled water.
9. Financial Planning:
Calculate the startup costs, ongoing expenses, and projected revenues to ensure financial viability.
10. Supply Chain Management:
Ensure a reliable supply of raw materials and efficient inventory management.
Choose your production output per hour:
CGF12-12-1 Bottle Washing Filling Capping Machine, 1000-2000 bottles per hour. CGF8-8-3 Bottle Washing Filling Capping 3-in-1 Machine, 2000-3000 bottles per hour.
CGF16-16-6 Bottle Washing Filling Capping 3-in-1 Machine, 4000-5000 bottles per hour. CGF18-18-6 Bottle Washing Filling Capping 3-in-1 Machine, 5000-6000 bottles per hour. CGF24-24-8 Bottle Washing Filling Capping 3-in-1 Machine, 8000-10000 bottles per hour. CGF32-32-10 Bottle Washing Filling Capping 3-in-1 Machine, 12000-15000 bottles per hour. CGF40-40-10 Bottle Washing Filling Capping 3-in-1 Machine, 16000-18000 bottles per hour.
Bottled water plant machinery:
1. (Making bottles) Automatic bottle blowing machine or Semi automatic bottle blowing machine.
2. (Water purification system) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into the bottle) Bottle washing filling and capping machine.
4. (Printing the date on the bottled water) CO2 laser date printing machine.
5. (Labeling bottled water) Shrink sleeve labeling machine or Sticker labeling machine.
6. (Package the bottled water) Automatic PE film shrink wrapping packing machine or Semi automatic PE film shrink wrapping packing machine / Carton box packing machine.
Main Technical Parameters
Item
CGF12-12-1
CGF8-8-3
CGF16-12-6
CGF18-18-6
CGF24-24-8
CGF32-32-10
CGF40-40-10
Production Capacity (BPH)
1000-2000
2000-3000
4000-5000
5000-6000
8000-10000
12000-15000
16000-18000
Washing head
12
8
16
18
24
32
40
Filling head
12
8
16
18
24
32
40
Capping head
1
3
6
6
8
10
10
Main motor power (KW)
1.0
1.5
2.2
3.5
4.5
6
7.5
Packing size (mm)
2000*1000*1800
2200*1200*2000
2400*1650*2200
2600*1920*2250
3100*2300*2250
3800*2800*2300
4600*2800*2350
Choose or customize the bottles you want:
Details Images
Customized small capacity container bottled water plant
Real Scene Shoots
Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Factory Address : No.141 Plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen City, Guangdong Province, China (It is one and a half hours' drive from Guangzhou)
No.1 Water Production Line on Alibaba.
20 Years Alibaba Verified Gold Supplier.
28 Years Production Experience.
147 Online Transactions Completed. 12,500 Square Meters Standard Factory.
180,000 USD Alibaba Trade Assurance.
1,750,000 USD Online Transaction Volume. 7,800,000 Yuan RMB Registered Capital.
ISO 9001:2008 Quality Management System.
CE Certified & TUV SUD Capability Assessment.
Certification Verified
If you want to know more about our company overview. Pls click VIEW MORE >
28 Years professional design and manufacturing experience.
Transaction History Verified
This supplier has completed 147 Transactions.
Our products are sold well not only in domestic, but also in Chile, Venezuela, Ghana, Kenya, Egypt, Peru, Maldives, United States, Brunei, Darussalam, Saudi Arabia, Panama, Cambodia, Bhutan, Bolivia, Bulgaria, Nicaragua, Dominican Republic, Somalia, Australia, Switzerland, Mozambique and other countries.
FAQ
Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Add: No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, China
Q1. Are you a factory or trading company? A1. We are a professional water treatment and filling machine manufacturing factory that set up for 28 years.We always pay attention to the development of the industry !.We can give a discount according to the quantity of machine you purchase. (20 years Alibaba Gold supplier)
B1. At the same time,we take effective measures to control the production process for ensuring the quality of products. Our products are certified.And we can supply SGS, BV, TUV, ISO9001, ISO14001, OHSAS18001, CE certification.
C1,Website: www.fostream.com Website on alibaba: https://jmangel.en.alibaba.com Q2. Where is your factory located? How can I visit there? A2:Our factory is located in No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, China, All our clients, from home or abroad, are warmly welcome to visit us!
Q3. What products does your company offer by yourself? A3:We are specialized in water treatment machines and small bottle filling machines, 5 gallon water filling machines.
Q4: When can I get my machine after I paid? A4: Normally production time is around 25 to 45 working days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port. Q5: How long of your warranty? A5: Regarding warranty, normally we offer 1.5 year warranty, and we also offer lifetime maintenance.
Welcome to China! Welcome to our factory!
(From Guangzhou Baiyun International Airport to our factory need only 85 minutes.)

Send Inquiry

Send Inquiry
Close Inquiry Basket

Send Inquiry
Close

Send Inquiry
Close
Chat with us!Search productsInquiry BasketBack to top
Close Inquiry Basket

Send Inquiry

Send Inquiry