Factory Cost Price Full Set Automatic Small Scale Mineral Pure Water Bottling Plant
1 set(s)Minimum order
application:
Beverage, Machinery & Hardware, Water
packaging type:
Bottles
packaging material:
Plastic, PET
automatic grade:
Automatic
driven type:
Electric
Voltage:
380V
Privacy Policy:
Samples are free within a certain price range
Other recommendations for your business
Contact us
Quik Detail
application | Beverage, Machinery & Hardware, Water |
---|---|
packaging type | Bottles |
packaging material | Plastic, PET |
automatic grade | Automatic |
driven type | Electric |
Voltage | 380V |
place of origin | Guangdong, China |
brand name | FOSTREAM |
dimension(l*w*h) | 3500*2000*2200 mm |
warranty | 1 Year |
key selling points | Easy to Operate, High-accuracy, Long Service Life, Automatic, High Productivity |
filling material | Water |
filling accuracy | 99.8% |
machinery test report | Provided |
video outgoing-inspection | Provided |
core components | motor, Pump, PLC, Bearing |
filling nozzle | 16 |
After-sales Service Provided | Video technical support, Online support, Free spare parts |
Function | Bottled Water Production |
Machine Capacity | 1000 to 18000 bottles/hour (Customized) |
Bottle Size | 200-2500ml (Customized) |
Bottle Shape | Round or Square |
Machine Material | Stainless Steel SUS304 |
Control System | PLC |
Display System | Color Touching Screen |
Workshop Layout | Free Design |
Advantage | Stable Operation |
Installation | Timely Overseas Engineer Service |
Weight | 3000 KG |
Product Detail

Products Description
How to set up a bottled water plant?
1. Market Research:
Analyze the demand for bottled water in your target area, study the competition, and identify your potential customers.
2. Legal Requirements:
Obtain the necessary licenses and permits, including business licenses, health and safety certifications, and environmental clearances.
3. Location and Facility:
3. Location and Facility:
Choose a suitable location with access to a clean water source. Design and construct a facility that meets hygiene and production standards.
4. Water Treatment System:
4. Water Treatment System:
Install advanced water treatment equipment to purify the water, removing impurities, contaminants, and microorganisms.
5. Bottling and Packaging:
5. Bottling and Packaging:
Purchase bottling machines and packaging materials to ensure the quality and appearance of the bottled water.
6. Quality Control:
6. Quality Control:
Establish a strict quality control system to monitor the water quality at every stage of production.
7. Staffing:
7. Staffing:
Hire trained and experienced workers for operations, quality control, and management.
8. Distribution and Marketing:
8. Distribution and Marketing:
Develop a distribution network and marketing strategy to promote and sell your bottled water.
9. Financial Planning:
9. Financial Planning:
Calculate the startup costs, ongoing expenses, and projected revenues to ensure financial viability.
10. Supply Chain Management:
10. Supply Chain Management:
Ensure a reliable supply of raw materials and efficient inventory management.
Choose your production output per hour:
CGF12-12-1 Bottle Washing Filling Capping Machine, 1000-2000 bottles per hour.
CGF8-8-3 Bottle Washing Filling Capping 3-in-1 Machine, 2000-3000 bottles per hour.
CGF16-16-6 Bottle Washing Filling Capping 3-in-1 Machine, 4000-5000 bottles per hour.
CGF18-18-6 Bottle Washing Filling Capping 3-in-1 Machine, 5000-6000 bottles per hour.
CGF24-24-8 Bottle Washing Filling Capping 3-in-1 Machine, 8000-10000 bottles per hour.
CGF32-32-10 Bottle Washing Filling Capping 3-in-1 Machine, 12000-15000 bottles per hour.
CGF40-40-10 Bottle Washing Filling Capping 3-in-1 Machine, 16000-18000 bottles per hour.


Bottled water plant machinery:
1. (Making bottles) Automatic bottle blowing machine or Semi automatic bottle blowing machine.
2. (Water purification system) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into the bottle) Bottle washing filling and capping machine.
2. (Water purification system) RO water purification machine / UF mineral water filtration machine.
3. (Filling water into the bottle) Bottle washing filling and capping machine.
4. (Printing the date on the bottled water) CO2 laser date printing machine.
5. (Labeling bottled water) Shrink sleeve labeling machine or Sticker labeling machine.
6. (Package the bottled water) Automatic PE film shrink wrapping packing machine or Semi automatic PE film shrink wrapping packing machine / Carton box packing machine.
5. (Labeling bottled water) Shrink sleeve labeling machine or Sticker labeling machine.
6. (Package the bottled water) Automatic PE film shrink wrapping packing machine or Semi automatic PE film shrink wrapping packing machine / Carton box packing machine.
Main Technical Parameters
Item | CGF12-12-1 | CGF8-8-3 | CGF16-12-6 | CGF18-18-6 | CGF24-24-8 | CGF32-32-10 | CGF40-40-10 | |||||||
Production Capacity (BPH) | 1000-2000 | 2000-3000 | 4000-5000 | 5000-6000 | 8000-10000 | 12000-15000 | 16000-18000 | |||||||
Washing head | 12 | 8 | 16 | 18 | 24 | 32 | 40 | |||||||
Filling head | 12 | 8 | 16 | 18 | 24 | 32 | 40 | |||||||
Capping head | 1 | 3 | 6 | 6 | 8 | 10 | 10 | |||||||
Main motor power (KW) | 1.0 | 1.5 | 2.2 | 3.5 | 4.5 | 6 | 7.5 | |||||||
Packing size (mm) | 2000*1000*1800 | 2200*1200*2000 | 2400*1650*2200 | 2600*1920*2250 | 3100*2300*2250 | 3800*2800*2300 | 4600*2800*2350 | |||||||
Choose or customize the bottles you want: |





Details Images
Customized small capacity container bottled water plant


Real Scene Shoots
Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Factory Address : No.141 Plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen City, Guangdong Province, China (It is one and a half hours' drive from Guangzhou)

No.1 Water Production Line on Alibaba.
20 Years Alibaba Verified Gold Supplier.
28 Years Production Experience.147 Online Transactions Completed.
12,500 Square Meters Standard Factory.
180,000 USD Alibaba Trade Assurance.
1,750,000 USD Online Transaction Volume.
7,800,000 Yuan RMB Registered Capital.
ISO 9001:2008 Quality Management System.
CE Certified & TUV SUD Capability Assessment.
Certification Verified


28 Years professional design and manufacturing experience.
Transaction History Verified
This supplier has completed 147 Transactions.
Our products are sold well not only in domestic, but also in Chile, Venezuela, Ghana, Kenya, Egypt, Peru, Maldives, United States, Brunei, Darussalam, Saudi Arabia, Panama, Cambodia, Bhutan, Bolivia, Bulgaria, Nicaragua, Dominican Republic, Somalia, Australia, Switzerland, Mozambique and other countries.



FAQ

Guangdong First Intelligent Drinking Water Equipment Co., Ltd.
Add: No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, ChinaQ1. Are you a factory or trading company?
A1. We are a professional water treatment and filling machine manufacturing factory that set up for 28 years.We always pay attention to the development of the industry !.We can give a discount according to the quantity of machine you purchase. (20 years Alibaba Gold supplier)
B1. At the same time,we take effective measures to control the production process for ensuring the quality of products. Our products are certified.And we can supply SGS, BV, TUV, ISO9001, ISO14001, OHSAS18001, CE certification.
C1,Website: www.fostream.com
Website on alibaba: https://jmangel.en.alibaba.com
Q2. Where is your factory located? How can I visit there?
A2:Our factory is located in No.141 plant, Qingnian Road, Chaolian Town, Pengjiang District, Jiangmen, Guangdong, China, All our clients, from home or abroad, are warmly welcome to visit us!
Q3. What products does your company offer by yourself?
A3:We are specialized in water treatment machines and small bottle filling machines, 5 gallon water filling machines.
Q4: When can I get my machine after I paid?
A4: Normally production time is around 25 to 45 working days, the exactly depend on what kind of machine you order. The shipping time is based on your destination port.
Q5: How long of your warranty?
A5: Regarding warranty, normally we offer 1.5 year warranty, and we also offer lifetime maintenance.
Welcome to China! Welcome to our factory!
(From Guangzhou Baiyun International Airport to our factory need only 85 minutes.)
